Project Description

This Design/Build Bridge Replacement Project spans the Intracoastal Waterway connecting the City of West Palm Beach and the Town of Palm Beach. The project includes removing the existing bridge and replacing it with a new four-lane bascule (span) bridge. The new bridge will be elevated to increase the clearance between the bridge and the waterway, which will reduce the number of bridge openings and improve both surface and marine traffic flow.

Estimated Construction Cost:

$107.4 million

Project Start:
Design services will begin in summer 2010

Anticipated Project Completion:
Late 2013

Contractor:
Design/Build Team selection is anticipated for early 2010