Flagler Memorial Bridge Replacement Project
Project Description
This Design/Build Bridge Replacement Project spans the Intracoastal Waterway connecting the City of West Palm Beach and the Town of Palm Beach. The project includes removing the existing bridge and replacing it with a new four-lane bascule (span) bridge. The new bridge will be elevated to increase the clearance between the bridge and the waterway, which will reduce the number of bridge openings and improve both surface and marine traffic flow.
Estimated Construction Cost:
$107.4 million
Project Start:
Design services will begin in summer 2010
Anticipated Project Completion:
Late 2013
Contractor:
Design/Build Team selection is anticipated for early 2010
FDOT District Four Design Project Manager
Jim Hughes, P.E.