Future Area Road Projects

S.R. A1A from Blue Heron Boulevard / U.S. 1 to South of Burnt Bridge

This project includes milling and resurfacing A1A on Singer Island in the City of Riviera Beach. Other project-related work includes: widening to provide paved shoulders; constructing curb and gutter; upgrading existing storm water drainage; building and reconstructing concrete sidewalks; installing decorative street lighting; and providing landscape and streetscape amenities. This is a Local Agency Program (LAP) project which will be managed by the City of Riviera Beach with oversight provided by FDOT District Four Palm Beach Operations Center.

Project Length:
3 miles

Anticipated Construction Start:
Spring 2010

Anticipated Completion:
Winter 2011

Estimated Construction Cost:
$13.2 million

City of Riviera Beach Community Development
Jerrell Harris, Planning and Zoning Administrator
Phone: (561) 845-4060

DOT District Four Design Project Manager
John Thompson, P.E.
Phone: (954) 777-4680
Toll Free: (866) 336-8435 × 4680
Email: John.Thompson@dot.state.fl.us

S.R. 5 / U.S. 1 from just north of the Parker Bridge to just South of S.R. 706 /Indiantown Road

This project includes milling and resurfacing the roadway, stormwater drainage improvements, sidewalk improvements, bike lanes, new traffic signs, pavement markings and traffic signals and landscaping.

Anticipated Construction Start:
June 2011

Anticipated Completion:
To be determined. This project may be constructed in conjunction with S.R. A1A project.

Anticipated Cost:
$11 million

S.R. A1A from just south of Burnt Bridge to just east of PGA Boulevard

This project includes milling and resurfacing the roadway and upgrading signs and pavement markings.

Anticipated Construction Start:
June 2011

Anticipated Completion:
To be determined. This project will be constructed in conjunction with S.R. 5 / U.S. 1 project

Anticipated Cost:
$500,000

FDOT District Four Design Project Manager
Fausto Gomez, P.E.
Phone: (954) 777-4466
Email: fausto.gomez@dot.state.fl.us